The Relopack Sp. z o.o. team, in cooperation with an engineering company, carried out the complete dismantling of a paper machine at a production site in the north of Finland. The main tasks included disassembly, labelling of parts, packing and loading into transport containers.
Project size - packed and loaded:
- 90 pcs, OT 40′
- 210 pieces, HC 40′
- 600 m3 breakbulk cargo
In addition, 2 cellulose towers with a capacity of 2,000 m3 and more than 20 tanks with a capacity of 20 to 80 m3 were cut up and transferred to a new factory abroad. The entire process, including the additionally commissioned mechanical work, lasted from April to October.
A total of 80 people worked on this project on a rotational basis, including the Project Manager, leads, logisticians, mechanics and fitters, locksmiths, electricians, packers, workers with mountaineering training.